Library / Maintenance
Publicly Available Case
2023APACAustralia

How BHP reduced outages through risk-based predictive maintenance

Models focus attention on high-risk failure modes, extending PM intervals. The result is fewer unexpected stoppages.

Context

Preventive maintenance was performed too frequently, while critical failures still occurred unexpectedly. This imbalance increased downtime and inefficient use of labor.

Solution

Risk-based monitoring models were introduced to identify failure modes and assess asset health in real time. Maintenance schedules were adjusted dynamically based on risk levels.

Results

The system enabled longer PM intervals and fewer unexpected outages, improving equipment availability and reducing unnecessary maintenance work.

Data Inputs

Telemetry, failure modes, work orders

Open source